Sandis provided engineering and surveying services for the replacement of the existing El Camino Mountain View hospital. The new 450,000 s.f. hospital is comprised of 300 licensed beds (85% private), emergency department (36 beds and 10 bed observation unit); 16 operating/interventional treatment rooms; and a conference center. In addition to the new hospital, the project included: Melchor Medical office building (3-story, 66,000 s.f.); New Oak Pavilion (2-story, 29,000 s.f.); Parking structure (4-story, 852 spaces); and Expansion of the central plant. Engineering services included demolition plans; grading and drainage plans; utility plans for storm water, sanitary sewer, domestic, and fire water; routing and alignment for site electrical; site structural; horizontal control plan; as-built plans; and storm water pollution prevention plan (SWPPP). Surveying services included the preparation of: boundary and topographic survey; ALTA survey; tunnel survey; interior floor survey; and exterior floor survey. During the final phase of the project, we provided construction administration services as well as construction staking.
El Camino Hospital Replacement
El Camino hospital MCH/MOB
El Camino Hospital Central Plant
El Camino Hospital Campus Survey
El Camino Hospital Multi Specialty Center
El Camino Hospital Behavioral Health Building Upgrade
Camino Medical Center
Multiple Projects