Sandis provided construction staking services for the development of a 440,877 s.f. hospital, 149,274 s.f. office building, and 314,144 s.f. garage. Services included: horizontal and vertical control, established control network at ground level with permanent monumentation and provided results with coordinates and exhibit; contractor staff training, assisted GC staff with learning how to use new survey equipment; temporary retaining wall, provided 2 stakes per pile for approximately 162 piles; rough grade hospital perimeter, provided rough grade stakes for the perimeter of excavation on approximate 75’ stations including changes of direction, high, low and grade-break points; rough grade – hospital interior, provided line and grade along grade-beam and footing locations including changes of direction, high points, low points, with grades marked subgrade elevation; building control.
Mills Peninsula Hospital
Mills Peninsula Health Services Accessibility, Burlingame
Mills Peninsula Health Services Accessibility, South San Francisco
Palo Alto Medical Foundation Hospital, Palo Alto
Palo Alto Medical Foundation Wellness Center, Palo Alto
Palo Alto Medical Foundation Clinic Expansion, Los Altos
Palo Alto Medical Foundation Hospital + Parking Garage, Mountain View
Palo Alto Medical Foundation San Carlos Minor Site Improvements
Sutter Health ADA Barrier Removal (1720 El Camino Real, 1875 Trousdale, 1785 Trousdale, 935 South El Camino Real)
Martinez Medical Center